EPS walls are erected on-site from ready to build panels in a tongue and groove method making the
erection of a 40 m2 (360 square feet) structure possible in less than 3 hours. Door frames, window frames, electrical conduits and plumbing components are pre-fitted in a factory environment, thereby significantly reducing costs and wastage.
Fibrecote™ is hereafter sprayed at high speed (10 minutes to empty a 160 litre mix), and due to the consistency of its batch mixing method, no retempering is required. Materials are often not batched and mixed thoroughly for conventional plaster. Tradesmen add water at random to achieve required consistency and frequently retemper the mix by adding more water. Fibrecote™ is batched and mixed in a concrete mixer using a preset formula depending on the required strength for the specific construction.
Our steel structure, foundation jig system, our precision EPS cutting machines that cut to within 0.02 microns and the preassembled door and window frames, ensure that our structures are plumb and square. If assembled correctly, there is no need to re-measure the structure after assembly for fitting of appliances and other post construction fixtures.
erection of a 40 m2 (360 square feet) structure possible in less than 3 hours. Door frames, window frames, electrical conduits and plumbing components are pre-fitted in a factory environment, thereby significantly reducing costs and wastage.Fibrecote™ is hereafter sprayed at high speed (10 minutes to empty a 160 litre mix), and due to the consistency of its batch mixing method, no retempering is required. Materials are often not batched and mixed thoroughly for conventional plaster. Tradesmen add water at random to achieve required consistency and frequently retemper the mix by adding more water. Fibrecote™ is batched and mixed in a concrete mixer using a preset formula depending on the required strength for the specific construction.
Our steel structure, foundation jig system, our precision EPS cutting machines that cut to within 0.02 microns and the preassembled door and window frames, ensure that our structures are plumb and square. If assembled correctly, there is no need to re-measure the structure after assembly for fitting of appliances and other post construction fixtures.