Efficient Processes

Print PDF

i.    Construction time: Imison saves between 66 and 75 percent in construction time over regular construction;efficient processes

ii.    Transportation: Imison can fit panels for 12 homes (40sqm sized) onto one flatbed, single axle truck.

iii.    Quality control: Imison controls the quality of its materials and process from the factory where all materials are pre-cut and pre-measured.

iv.    Waste: all EPS off-cuts are recycled in Imison’s manufacturing processes.   On-site waste is 5 percent compared to regular construction’s 15 percent.

v.    Agrement and NHBRC approved.